Tiln Farm Project

The Tiln Farm energy storage project integrates Trina Storage’s self-developed Elementa, a liquid-cooled battery system designed to support a range of grid ancillary services, including frequency response, voltage regulation, and reactive power control. By enhancing grid stability and optimizing energy dispatch, the system enables revenue-generating opportunities for operators while ensuring long-term reliability and efficiency.

150MW Agriculture, Fishery, PV and Storage Integration Project

The agricultural and fishery PV complementary power station all uses Trinasolar 210mm Vertex series high-efficiency modules. The project was built in two phases, both equipped with Trina Storage Power Station, and the second phase project is equipped with Trina Storage Elementa series system. This project is a preferred and key project for the conversion of new and old kinetic energy in Shandong Province, covering an area of ​​about 2,900 acres. It uses the existing subsidence land and builds various special greenhouses to build a new development model of “planting under the board and PV on the board”, creating an agricultural tourism complex of “PV + agriculture + fishery”, and turning the disadvantages of coal mining subsidence areas into ecological and environmental advantages.

16kW Residential Rooftop Project

In a high-end community in Brisbane, the Vertex S+ modules are neatly arranged on the roof of the villa, perfectly blending with the blue sky, white clouds and the surrounding rainforest. The total installed capacity of this project is 16kW. The average annual power generation is about 21,731 kWh, and the average annual carbon emission reduction is 18.21 tons.

Haixi Crook Shared Energy Storage Station Project

The project utilizes 15 sets of Elementa 2 – 0.25P long-duration energy storage systems, each equipped with 2.5MW/10MWh flexible battery cabinets featuring in-house 314Ah Trina Storage cells and a 5MW PCS-MV integrated unit. The entire process, including delivery, infrastructure, commissioning, and grid connection, was completed within 45 days, demonstrating Trina Storage’s project deployment efficiency.