群馬県 高圧系統向け蓄電池プロジェクト

群馬県の2拠点にて、トリナ・ストレージのElementa 2蓄電システムを導入。日本市場初の高圧系統向け蓄電プロジェクトとして、日本・中国・シンガポールのエンジニアが連携し、コンテナ型蓄電池、PCS、EMSの接続から試運転、系統連系の準備までをわずか3週間で完了しました。現場対応力と製品の信頼性が高く評価されています。

Wutumeiren 50MW parity PV Power Station Project

This project is located at Wutumeiren solar park, Golmud City, Qinghai. The overall project scale reaches up tp 50MW. The average annual power generation is estimated to be 1950 equivalent utilization hours after the project is completed. The gobi desert environment, heavy sand-wind weathers and large temperature differences will not influence project’s operation; high power generation and high reliability of 210mm 670W Vertex ultra-high power modules can fully meet customer needs.

2.3MW PV Power Plant Project

Located in Fukuchiyama City, Kyoto Prefecture, the project is developed by Trinasolar’s Overseas Power Plant Business Unit (ISBU), which focuses on the development and delivery of large-scale photovoltaic projects around the world, and uses Trinasolar’s Vertex N 720W series modules, which is expected to generate 2,700MWh of clean energy per year and reduce carbon dioxide emissions by about 1,760 tons.

PPA水上太陽光発電所 埼玉久喜

埼玉県久喜市にて、PPAモデルの水上太陽光発電所を導入。本プロジェクトでは、Vertex N 700W+ NEG21C.20モジュールを使用し、総出力2.4MWの水上設置型太陽光発電所を実現しました。PPAモデルの採用により、長期的な再生可能エネルギー供給に貢献します。高出力のVertex Nシリーズ採用により、長期の発電安定性に寄与します

560MW PV Power Plant at A High Altitude

This project is located in Hainan Prefecture, Qinghai Province and is the first large-scale base demonstration project in Xinghai County. The average elevation of Hainan is 3200 meters, and it is the first time that Datang Qinghai Energy Development Co., Ltd. has adopted N-type large-sized ultra-high power bifacial dual glass modules at high altitude and cold regions. The project is expected to be completed and put into operation by the end of 2023, with an average annual power generation of approximately 1.077 billion kWh.

商業施設屋根設置 マルアイ総合食品スーパー自家消費

兵庫県にて、総合食品スーパー「株式会社マルアイ」が、トリナ・ソーラーのVertex S+ TSM-NEG18R.28モジュールを導入し、自家消費型の太陽光発電設備を設置しました。
創業50周年を迎えた同社は、省エネ化とカーボンニュートラル推進を積極的に進めており、魚住店では500ピッチ折板屋根に最適な設計で当初シミュレーションを上回る自家消費率を達成。店舗全体の電力コスト削減と環境負荷低減に貢献しました。2024年には尾上店と太子店にも同モデルを導入し、再生可能エネルギー活用をさらに拡大しました

1.37MW C&I PV Power Station Project

Hefei Garden Expo Park is located in Luogang Park, covering an area of about 323 hectares, which is located in the core of the city and is the world’s largest central park. The project uses Vertex N 210R rectangular silicon wafer modules with a capacity of about 1.37MW, which has been successfully connected to the grid. Ecological garden + photovoltaic, Trina’s n type standard-size modules help Hefei open a new green landmark with a gold design.