The Campiña project, located in Córdoba, Spain, has an installed capacity of 11.32MW. The power station comprises 186 Vanguard-1P trackers and 21,180 bifacial modules. The entire station is integrated with the Smart Cloud platform, with 62 trackers equipped with the SuperTrack algorithm. Commissioned in September 2022, the project is capable of supplying electricity to 7,500 households and reduces carbon dioxide emissions by 4,500 tons annually.
Category Archives: Global Case
5.6MW C&I PV Power Plant Project
Trinasolar has partnered with Bright Moon Seaweed Group and Kyushu Huide to build a 5.6MW C&I photovoltaic rooftop power plant. After the project is connected to the grid, it will reduce emissions of about 3,600 tons of carbon dioxide, 9 tons of nitrogen oxides and 3 tons of sulfur dioxide every year, which is equivalent to planting millions of trees.
500kW C&I project in Japan
The total capacity of this project is 500kW, all using Trinasolar Vertex S+ 510W modules, with an annual power generation of about 600,000 kWh. The successful implementation of the project not only helps enterprises save energy and reduce carbon emissions, but also becomes an ideal choice for promoting C&I and public facilities to move towards carbon reduction goals.
26.6kW C&I Project
The construction of a demonstration photovoltaic power plant project with modules provided by Trinasolar has been completed at the Yangtze River Delta Institute for Sustainable Development in Shanghai. The plant, with total installed capacity of 26.6 kW, is forecast to generate power of 26,853 kWh and reduce CO₂ emissions by 22.5 tons a year.
Haixi Crook Shared Energy Storage Station Project
The project utilises 15 sets of Elementa 2 – 0.25 P long-duration energy storage systems, each equipped with 2.5 MW/10 MWh flexible battery cabinets featuring in-house 314 Ah Trina Storage cells and a 5 MW PCS-MV integrated unit. The entire process, including delivery, infrastructure, commissioning, and grid connection, was completed within 45 days, once again demonstrating the “Trina Speed”
4 Energy Storage Stations in Massachusetts, NA
This project marks the first jointly implemented fleet of battery energy storage systems (BESS) in the state, highlighting Trina Storage’s commitment to enhancing grid resilience and supporting sustainable energy solutions.