The project adopts Trina Storage Elementa liquid-cooled energy storage system, and the whole cabin protection level is up to IP54/C5, with good waterproof and anti-corrosion performance. And with the intelligent liquid-cooled system, it can keep the temperature difference inside the cabinet within 3℃.
Category Archives: Global Case
Tiln Farm Project
The Tiln Farm energy storage project integrates Trina Storage’s self-developed Elementa, a liquid-cooled battery system designed to support a range of grid ancillary services, including frequency response, voltage regulation, and reactive power control. By enhancing grid stability and optimizing energy dispatch, the system enables revenue-generating opportunities for operators while ensuring long-term reliability and efficiency.
Berkeley Energy Storage Power Station Project
The project adopts the Trina Storage Elementa, the liquid-cooled energy storage system. It is Trina Storage’s first overseas collocated PV-energy storage project. It not only enhances grid stability but also maximizes energy utilization and customer revenue.
500kW C&I project in Japan
The total capacity of this project is 500kW, all using Trinasolar Vertex S+ 510W modules, with an annual power generation of about 600,000 kWh. The successful implementation of the project not only helps enterprises save energy and reduce carbon emissions, but also becomes an ideal choice for promoting C&I and public facilities to move towards carbon reduction goals.
45.5MW seawater desalination PV power plant project
45.5MW seawater desalination PV power plant project in Jubail, Saudi Arabia
The project is located in Jubail City, Saudi Arabia, in a coastal area with a complex climate and environment. The temperature difference between day and night is large, the soil is soft and sandy, and there are strong winds and dust, etc. Trinasolar’s Vertex N 700W series module has withstood various tests and can generate electricity efficiently in the area. Its 45.5MW photovoltaic power station can generate electricity that meets 20% of the daily energy consumption of the water plant, and can reduce carbon emissions by 60,000 tons per year.
Trinasolar Shanghai Global Headquarters BIPV Project
The Fourteenth Five-Year Plan National Key R&D Program Technology Demonstration Project;
The BIPV and digital smart energy strategy pilot project;
The first zero-carbon building and ultra-low energy consumption zone demonstration project in Shanghai.