Greece is a project where Trina is acting as IPP since July 2013.The Project consist of 22 PV Plants located in Greece mainland, northern of Athens. Trina SBU has successfully finalized the development, managed the last phase of the construction through different EPC Contractors, and applied for the Feed in Tariff mechanism operated the Plants for almost 3 year. The project started development in 2011, construction in 2012 and connected in 2012.
Author Archives: johnson
West Raynham UK
The PV Plant, built in the former Royal Air Force West Raynham Airbase, has a capacity of approximately 50 MWp, representing the biggest PV plant operational in UK at the date of completion. The 49.99 MW solar power plant using Trina Solar’s 196,627 modules commenced construction in the third quarter of 2014 and was connected to the grid in the first quarter of 2015. It is entitled to receive 1.4 Renewables Obligation Certificates (ROCs) per megawatt-hour (MWh). As built, the project can supply clean energy to up to 14,000 UK homes per year.
Bayerische Staatskanzlei (Bavarian State Chancellery)
The solar power (PV) system erected in November 2012 on the roof of the Bavarian State Chancellery proves that modern solar systems can also be profitably operated on listed buildings.
Retirement Home
MP Next, having much experience in the design of systems for both residential and industrial projects, is able to produce systems which successfully integrate the use of renewable sources and the necessary compliance with building regulations. In this project, a retirement home in Muggió, located North of Milan, the aim was to provide a rooftop PV system whilst bearing in mind the complex building and fire safety requirements, these being particularly important in a residential home for elderly people.
Homeland Solar Farm
The decision to build a large solar farm in Three Legged Cross was heavily influenced by Dorset having more sunshine than most other UK locations. This Grade 4 agricultural land, with a soil base of sand and gravel, was an ideal situation for a solar project. With Good Energy’s proposal to the Council having been approved in October 2013, Trina Solar purchased, completed, and maintained the project and has now sold it. Construction began in December 2013 with connection to the grid taking place in March 2014. Being thoroughly committed to encouraging biodiversity, Trina Solar worked with the farm’s owners and the local community to ensure that the landscape and wildlife habitats were protected during construction and, through Toolbox Talks, ensured that adverse effects to, and offences against protected species were avoided. The project’s 52,000 multicrystalline panels provide enough clean solar electricity to power 4,300 local homes for 25 years. The polycrystalline Honey module performs well in cloudy conditions and delivers an excellent efficiency of 15.9% with a maximum power output of 265W. It exceeds the standard requirements for snow and wind loads and is ideal for all rooftop installations.
Les Mées
Having attracted an investment of nearly 70 million Euros, the Mees project, initiated in late May 2010 and completed in January 2011, involved and provided work for 350 people for nearly a year in the development of these solar power stations. Built on on a 36 ha plot, the site involves the installation of 79,000 Trina Solar TSM-230PC05 modules representing a power output of 18.2 MW (12 MW and 6.2 MW).
Park Villas Rooftop
The project is the largest Multi-family Affordable Solar Housing (MASH) project in California and will generate 775,000kWh of electricity annually, enough to power 144 housing units and property common areas. In addition to supplying solar energy to the families living in Park Villa. The system will reduce green house gas emissions by approximately 5,000 tons of CO2 per year – the equivalent of planting 20,000 trees.
Autostrade
This ongoing project began in 2008 when Enereco Energy Solutions Srl won the contract to supply a large quantity of photovoltaic modules to form a power saving system along the Italian motorway network by using the rooftop space on car parking shelters at service stations.
Su Scioffu
The Su Scioffu installation is located in Sardinia in Italy. It is already considered to be one of the largest installations on greenhouse roofs. With an installed capacity of 20 MW, it will also generate 26 gigawatt hours per year (GWh), enough electricity to meet the annual needs of 10,000 homes. As part of this project, 84,399 polycrystalline Trina Solar modules were installed, each with a power output of between 230 and 240 W, on the 100,000 square metres of roofing on the greenhouse.
Sägewerke Christen AG
Sägewerke Christen AG in Luthern (Canton of Lucerne) runs the first energy-self-sufficient and CO2-neutral saw mill in Switzerland. The in-roof PV system of the saw mill’s production and storage halls was developed by SunTechnics Fabrisolar AG from Küsnacht. It has a power of 900 kWp and produces up to 6,000 kWh of solar energy each day. The 6,000 m2 system consists of PC05A Honey multicrystalline solar modules with a power of up to 260 W. It supplies electricity for the operation of the saw mill and for 300 homes – a total of 900,000 kWh each year.