"Buildex" PV installation robot
- AI Vision-Guided
Industrial-grade 3D camera with a deeply optimized AI positioning algorithm achieves high-precision recognition and guidance.
User-friendly interface and rapid deployment.
- Efficiency Revolution
Double the Efficiency of Manual Labor, Ultra-Fast Installation.
Comprehensive installation efficiency exceeds 60 pieces/hour.
- Superior Compatibility
Conquering Many Terrains and Many Mounting Systems.
Adjustable robotic arm base.
Industry-leading 17° leveling capability of the upper platform.
- Flexible Material Loading
Innovatively integrated forklift tines and a flipping mechanism eliminate the need for forklift assistance.
Compatible with both horizontal and vertical module packaging fromat.
- Safety Redundancy
Multi-Sensor Perception, Fail-Safe Operation.
LiDAR combined with AI fusion perception avoids operational risks.
A redundant dual-circuit vacuum system with power-off pressure retention prevents accidental drops.
Anemometer detects wind speed in real time.
Strategically placed emergency-stop buttons.